PROJECT - Electronics Manufacturing Unit

                                Kongovi Electronics 2                   Kongovi Electronics 1

BGSB was trusted upon responsibility by this client (name withheld) to construct their Factory floor located at Dasanapura Hubli, Bengaluru.

BGSB scope started with laying of concrete up to 150mm by Truss Screed Machine. Application of Hardener was met to get abrasion resistant to the floor. Curing compound was further added to increase floor resistance thereby Saw cutting process was carried upon as well pouring of sealants to avoid cracks on given floor.

Ideal Hard System for Floor Hardening & Densifying system was put on use with 5 step diamond satin gloss polishing, thereby warranting the floor against dusting for 7 yrs.

BGSB executed the project concluding floor with a very hard surface and semi glossy look.

                    Kongovi Electronics 3                    Kongovi Electronics 4

PROJECT - Transformers Manufacturing Unit

                                  ESSENER 2                            ESSENER 5

BGSB was distinguished out consecutively for third time by Transformers Manufacturing Unit (name withheld) to execute Polished Concrete Floor at their factory premise located in Medak District, Hyderabad.

BGSB laid Concrete up to 150mm using Truss Screed & then applied Hardener on the top layer of the casted slab to get it resistant to abrasion. Took altogether 18 Days for Curing, Polypropylene Fiber is used to impart extra strength to the Floor.

Saw Cutting was done & Sealants were used to avoid Cracks, concluded by Polished Concrete System up to 3000 grit for high gloss finish; thereby warranting the Floor making it immune to dusting for 10 years

Hence BGSB executed project having a very hard surface floor and high glossy look.  

                              ESSENER 4                           ESSENER 3

PROJECT – Fruit & Juice Processing Unit

                 fruit juice processign unit           fruit Juice processing unit     

BGSB was bestowed upon faith of this client (name withheld), once again for third time to execute their factory premise near Hyderabad by making BGSB as an inseparable part of their expansion and growth.

BGSB initiated laying of concrete up to 150mm using Truss Screed topped with 3MM wear layer hardener on top to make the floor 100%  resistant to any abrasion that may come on floor. Dummy joints were cut within 24 HRS to avoid unwanted cracks. After curing, the floor was further treated with Ideal Hard System, a hardening and densifying system leaving satin sheen effect and fully warranted against dusting for tenure of 7 years.